Key takeaways
- The Devimed concession reverted to the Nation on July 31, 2026, a financing trust (fideicomiso) is expected in 2027, and handover to Invías is expected in 2028.
- Understanding the route matters because each town along it plays a different role.
- Today, the door-to-door drive from El Poblado in southern Medellín to Guatapé runs roughly 2 hours under normal conditions, and meaningfully longer on Sunday evening returns when bumper-to-bumper traffic forms through La Ceja and Marinilla.
- The cleanest precedent for the Medellín-Guatapé corridor is the Bogotá-Girardot highway, completed in phases between 2010 and 2014.
- Completed in major segments between 2018 and 2022, this corridor cut the Medellín to Caucasia drive from 9 hours to 5 hours, opening up northern Antioquia agricultural and small-city markets to capital from the Aburrá Valley.
Updated November 2026, 8 min read
The planned Medellín-Guatapé doble calzada is in pre-construction: the Devimed concession reverted on July 31, 2026, the financing trust is expected in 2027, handover to Invías in 2028, and major works are expected to begin from late 2027 at the earliest. There is no official opening date, and the drive today is roughly 2 hours. Past highways in other corridors are described below as history, not a prediction.
The Project: Scope, Timeline, and Status
The Medellín to Guatapé corridor upgrade is a planned doble calzada (dual carriageway) on the Marinilla-El Peñol-Guatapé road, which today is served by the Devimed concession. The Devimed concession reverted to the Nation on July 31, 2026, a financing trust (fideicomiso) is expected in 2027, and handover to Invías is expected in 2028. Major works are not expected before late 2027, and there is no official opening date. We do not publish a project budget because none has been confirmed.
The Route: Medellín to Guatapé Step by Step
Understanding the route matters because each town along it plays a different role. The drive starts in central Medellín or Poblado. From there, vehicles enter the Túnel de Oriente through the Las Palmas portal, exit into Rionegro near José María Córdova International Airport, and continue east through the rolling Antioquia plateau.
| Corridor Stop | Distance from Medellín | Role |
|---|---|---|
| Rionegro | 25 km | Airport hub |
| Marinilla | 42 km | Commercial corridor |
| El Carmen de Viboral | 52 km | Artisan town |
| El Peñol | 70 km | Reservoir gateway, lake access |
| Guatapé | 79 km | Lakefront destination |
Calculator · True cost to close
What does it really cost to close?
Notarial, registration and beneficencia on your price, in USD and COP. No account, no email.
Your result shows once you add Guatapé Properties as a preferred source on Google. One click, no account, no email.
Enter a price to calculate.
- Notarial fee0.27%, buyer's customary half
- Registration tax0.67%
- Beneficencia1.00%
- Stamp tax (timbre)Marginal, only on the slice above COP 1,047,480,000; negotiated at the notary
- Total in COP
Your lawyer's fee for title review isn't included here, that figure is theirs to give you.
Google · Preferred source
Your closing costs are ready.
Add Guatapé Properties as a preferred source on Google and they show right here, line by line, with a printable version. One click, no account, no email. Google shows more of our Guatapé coverage in your Top Stories.
Travel Time: About 2 Hours Today
The single most important number on this page is travel time, because it is the variable that converts Guatapé from a tourist destination into a real-estate market. Today, the door-to-door drive from El Poblado in southern Medellín to Guatapé runs roughly 2 hours under normal conditions, and meaningfully longer on Sunday evening returns when bumper-to-bumper traffic forms through La Ceja and Marinilla. Holiday-weekend trips can stretch to 3 hours each way.
The highway has no opening date, so no travel-time saving can be counted on yet.
Historical Comparable One: Bogotá-Girardot Highway
The cleanest precedent for the Medellín-Guatapé corridor is the Bogotá-Girardot highway, completed in phases between 2010 and 2014. Like the eastern Antioquia corridor, the Bogotá-Girardot project shortened a 4-hour mountain crossing to a 2 to 3 hour valley descent, converting Girardot and surrounding Cundinamarca towns from weekend destinations into legitimate second-home markets for the 8-million-person Bogotá metropolitan region.
The appreciation pattern in corridor towns followed a predictable curve. In the 24 months before partial opening, prices rose 25 to 40 percent as speculative capital flowed in. During the partial opening phase, prices rose another 30 to 50 percent as the catalyst became tangible. In the 36 months after full completion, prices in Girardot, Ricaurte, and Flandes saw further price gains as actual user demand replaced speculation. Cumulative five-year appreciation in the best zones reached 65 to 110 percent, with the highest figures concentrated in waterfront and view properties along the Magdalena River.
Historical Comparable Two: Medellín-Caucasia Corridor
A second precedent, closer to home for Antioquia investors, is the Medellín-Caucasia highway. Completed in major segments between 2018 and 2022, this corridor cut the Medellín to Caucasia drive from 9 hours to 5 hours, opening up northern Antioquia agricultural and small-city markets to capital from the Aburrá Valley.
Corridor towns including Yarumal, Valdivia, and Tarazá experienced appreciation historically around 7-8% annually in the 3 to 5 years following partial opening. The magnitude was lower than Bogotá-Girardot because the underlying demand pool (greater Medellín, roughly 4 million people) is smaller than greater Bogotá (roughly 8 million), and because the destination towns lacked Guatapé's tourism profile. These are past corridors, not a prediction for Guatapé.
Risks: Delays, Scope Changes, and Political Turnover
Buying ahead of an infrastructure project carries risk. Three categories of risk deserve explicit attention. The first is timeline risk. Colombian road projects have a history of slippage, with many running behind their original schedules. There is no official opening date for the Medellín-Guatapé corridor, and major works are not expected to begin before late 2027.
Corridor Stops: Medellín to Guatapé
The major corridor towns run from Medellín to Guatapé, and each plays a distinct role.
Guatapé & El Peñol neighborhoods at a glance
Verified zones, price ranges in USD/m² (March 2026)
| Zone | Municipality | USD / m² | Type | Key feature |
|---|---|---|---|---|
| Cabecera (Casco Urbano) | Guatapé | $1,000–1,500 | Centro / Comercial | Tourist core, zócalos, Malecón |
| Los Naranjos | Guatapé | $1,800–3,000 | Lakefront premium | Parcelación Venecia, gated estates |
| La Piedra | Guatapé | $1,200–2,200 | Mixed residential | 220m monolith, ring road access |
| El Roble (Centro Poblado) | Guatapé | $900–1,400 | Residential / Tourism | Parque Comfama 22ha adjacent |
| La Sonadora | Guatapé | $800–1,300 | Rural residential | Mountain bike route, ring road |
| Santa Rita | Guatapé | $700–1,100 | Rural lakefront | Reservoir spillway, viewpoint |
| Cabecera (Nuevo Peñol) | El Peñol | $700–1,200 | Centro urbano | 6 comunas, 11 barrios (1978 rebuild) |
| El Marial | El Peñol | $1,500–2,500 | Lakefront premium | Guatapé-side shoreline, Stone of El Marial |
| La Cristalina | El Peñol | $900–1,500 | Residential consolidado | Established community, Lake views |
| Palmira | El Peñol | $800–1,400 | High-inventory south-shore | Active new construction |
| Guamito + Horizontes | El Peñol | $1,000–1,800 | New construction | Modern lakefront developments |
Closing Costs, Timeline, and Foreign-Buyer Logistics
Buying property in Colombia as a foreign national is straightforward when the workflow is set up correctly. Foreign buyers have the same property-ownership rights as Colombian citizens, no special permits or visas are required to acquire real estate, and title is held in the buyer's name or in a Colombian SAS company structure depending on tax planning goals. The transaction completes at a notaría pública, registered to the buyer in the Oficina de Registro de Instrumentos Públicos.
Buyer closing costs typically run about 2 percent of the purchase price. The line items are the notary fee (0.27 percent, the buyer's half), the registration tax (0.67 percent), and the beneficencia regional tax (1.0 percent). Legal counsel is an additional fee. Annual property taxes (impuesto predial) run 0.3 to 1.0 percent of the cadastral value, generally well below the market value. Profit on a future sale is taxed as ganancia ocasional at 15 percent if held two years or more (ordinary income if less), and exemptions may cover the first 7,500 UVT when proceeds are reinvested in a home.
| Closing Cost Item | Typical Range | Paid By | Notes |
|---|---|---|---|
| Notary fee | 0.27% (buyer's half) | Split 50/50 | Set by the national tariff |
| Registration tax | 0.67% | Buyer | Paid at Oficina de Registro |
| Beneficencia regional | 1.0% | Buyer | Departmental tax, collected at the notary |
| Legal counsel | Separate fee | Buyer | Title review and SAS setup |
| Total statutory | About 2% | Buyer | Plus legal counsel; any agent commission is negotiated |
How we knowFigures as of November 15, 2026. Prices: active listings we verified ourselves; USD rate: TRM 3,316.70 COP per US$1, valid November 14, 2026 (Banco de la República, via datos.gov.co).
Frequently Asked Questions
When does the new Medellín-Guatapé highway open?
There is no official opening date. The Medellín-Guatapé doble calzada is in pre-construction: the Devimed concession reverted on July 31, 2026, the financing trust is expected to be constituted in 2027, and major works are expected to begin from late 2027 at the earliest.
How much will travel time change between Medellín and Guatapé?
Current door-to-door travel time between Medellín and Guatapé runs roughly 2 hours, often longer on holiday weekends with heavy traffic through La Ceja or Marinilla.
How much have similar Colombian highways increased property values?
The Bogotá-Girardot highway (2010 to 2014) was followed by 65 to 110 percent appreciation in corridor towns within five years, and Medellín-Caucasia by around 7-8% a year. These are past corridors, not a prediction for Guatapé.
What if the highway is delayed past 2028?
Colombian road projects have a history of slippage. There is no official opening date, and major works are not expected to begin before late 2027. The institutional track so far: concession reversion in 2026, financing trust expected in 2027, handover to Invías in 2028.
Related Guides
Ask about properties
Ask which properties along the corridor are available today.
Explore More Guatapé & El Peñol Guides
- Guatapé Real Estate
- Houses for Sale
- Apartments for Sale
- Lakefront Property
- Cabins for Sale
- Fincas / Farms
- Land for Sale
- Investment Property
- El Peñol Real Estate
- Los Naranjos
- El Roble
- El Marial (El Peñol)
- Palmira (El Peñol)
- Guamito y Horizontes
- La Cristalina (El Peñol)
- Sell Your Property
- Buying Guide